The following are the June 2019 work activities:
- Continued localized paint removal
- Continued identification of structural steel deficiencies and repairs
- Continued identification of concrete pier and abutment deficiencies
- Continued with Class “S” Concrete and Variable Depth pier and abutment repairs
- Continued identification of bottom side concrete deck deficiencies and repairs
- Completed installation of Stage 2 YDB sidewalk detour on the north side of the bridge and commenced Taxi service
- Completed installation of Stage 2 temporary barrier on the north side of the bridge
- Continued identification of concrete deck repairs
- Continued with partial depth and full depth concrete deck repairs (night)
- Continued patching of roadway potholes as required (night)